Gallery

Projects across Singapore

A selection of recent LV and HV cable jointing, termination and substation works.

22kV heat shrink termination on switchgear
Project
22kV Termination · HV Switchgear
HV cable termination trifurcating boot
Project
HV Termination · Trifurcating Boot
HV cable connection to transformer
Project
HV Cable to Transformer
LV cable termination at busbar chamber
Project
LV Termination · Busbar Chamber
LV distribution board cable terminations
Project
LV Distribution Board
LV fuse switch cable connections
Project
LV Fuse Switch Connections
Straight through cable joint underground
Project
Straight Through Joint · Underground
Cable joint in service pit
Project
Cable Joint · Service Pit
Cable fault repair excavation
Project
Cable Fault Repair · Excavation
Cable jointing in progress
Project
LV Cable Joint · Marina Bay
Substation switchgear
Project
Consumer Substation · Jurong
22kV cable termination
Project
22kV Termination · Tuas
LV cable jointing
Project
LV Branch Joint · Punggol
Emergency cable repair night
Project
Emergency Response · Changi
Cable cross section
Project
XLPE Cable · Data Centre